Funan shingles wholesale, Yingshang County asphalt shingles agents, construction glass tile Guoyang, Mengcheng County cola tile agency, Lixin County (county towns) Qiaocheng Asphalt shingles wholesale construction national standard thickness of not less than 2.6mm, effective use of time is 20 according to tile, tile categories, tile material service life - 50 years, and general construction method is as follows, if you need, you can inquire our company for you to solve this problem . Liu can find. Construction procedures and methods (a) asphalt shingle roof slope is usually used as a roof slope of 20 to 90 degrees. (B) mortar asphalt shingles is a flexible tile flatness grassroots will directly affect the quality and appearance after laying asphalt shingles, and therefore should strictly control the surface flatness of cement mortar layer. (C) brushing the cold base oil (customized by the customer) before brushing the cold base oil, check the screed surface should be smooth and clean. Brushing to thin and uniform, without gaps, pitting, bubbles. If the primary surface is too rough, you should brush again slow volatile cold base oil, wait until after the preliminary drying, painted over fast cooling volatile base oil. Brushing time 1-2 days before laying tile wave fiber were. (Iv) there is a self-styled self-proclaimed adhesive glue adhesive glue on asphalt shingles. There is a sealed transparent plastic film with Pu adhesive glue on the self-styled, in the construction, tear this plastic film tape, self-styled assembly glue exposed to sunlight, and slowly will automatically bottom two tiles stick. (V) the nail 1, the correct way to nail down the roof of the good performance is critical. We must comply with the following requirements: (1) You must use galvanized nails rust treatment; (2) six nails per tile, as required to determine the position of the nail. (3) nails should be driven into straight, and the top cap is flush with the glass tile. 2, nail decorative seam position at the top of 16mm, 25mm at the end from the two sides, and the distance between the left and right of each decorative sewing center at 25mm. (Vi) the difference in size of each elastic line of asphalt shingles is not very noticeable, but over a large roof, built up these small differences may cause the bottom of asphalt shingles or decorative sewing skewed, therefore, play line help ensure the laying asphalt shingles, horizontal and vertical straight line. Elastic line between the eaves to the ridge must be vertical. Each line distance between the vertical 167mm. Then start from the eaves was followed up shells line the horizon; the first horizontal line to play away from the initial layer of asphalt shingles at the bottom of 188mm, then the interval between each horizontal line of 145mm. (Vii) the oblique ridge and roof of asphalt shingles installed before laying ridge, first put on the roof of asphalt shingles laying up to two roof ridge and roof of the ramp, in order to facilitate shut, finally laying layers of asphalt shingles slightly adjusted, so that the roof asphalt shingle roofing asphalt shingles can adequately cover the top level, and on both sides of the roof and the roof equal to the width of the lap. 1, the production of asphalt shingles were Jiwa Waqie the single asphalt tiles cut into three pieces of 333mm. 2, the installation of asphalt shingles ① oblique ridge rugged first asphalt shingles at the eaves. ② with nails to a cuesta asphalt shingles temporarily fixed in oblique ridge highest point ③ oblique ridge along the first side to a temporary asphalt shingles asphalt shingles cuesta side, playing a line. ④ then temporarily cuesta asphalt shingles removed. ⑤ from cuesta bottom, began to install cuesta asphalt shingles. ⑥ asphalt shingles each 145mm of leaving exposed parts. ⑦ asphalt shingles on both sides of each individual hammer a nail to make a fixed, set nail should be located away from the sides of 25mm, close to the self-adhesive areas. ⑧ cut every last ridge oblique ridge, making them the center of the intersection of the roof natural fit. ⑨ along the center line of the first cut of asphalt shingle roof 100mm long period, and it is fixed to the roof. (See Figure 4) ⑩ the bifurcated two half sheets were placed in two intersecting ridge oblique ridge, and fixed. ⑾ coated with asphalt glue on an exposed nail. (H) requires construction workers construction workers should be wearing shoes, shoes and appropriate safety measures should be prepared; Preparation Tool: wood, wallpaper knife, whip the child. After (ix) Clean all asphalt shingles construction is completed, please clean fragmentary material on the roof, thoroughly inspect and clean the roof.